|   Important Work Experiences - Time respectively A - Executive works in private and contractor section       
        Supervisor of infrastructure facilities at Qasr-e-Shirin new city, Kermanshah, Iran - Madiran CompanyTechnical and executive supervisor of Kermanshah museum, Kermanshah, Iran - Concrete structure - Dodan CompanySite manager of children hospital project (200 beds), Kermanshah, Iran - Steel structure - Sooleh Team companyTechnical supervisor of Bakhtar leather facotory, Kermanshah, Iran - Concrete and steel structure - Accompaniment with the contractorTechnical protocol with project management of central building of Oil engineering company (40'000 sqm) - Kamraniyeh, Tehran, IranTechnical protocol with project management of a complex in Pardis Technology Park (7'000 sqm)Technical protocol with project management, design and construction of grand tourism complex of Imam Reza, Mashad, IranTechnical supervisor protocol with the contractor of gas compressure project, Siri Island site, IGC, Persian Gulf, IranTechnical and executive consultant protocol of prepareing project of the Pardis Technology Park, 3rd phase, Presidential Technology Office, Tehran, IranSite manager of Hanieh Hotel (5 stars), Mshhad, Iran - 22'000 sqm including parking and shopping center. (Photo Album)Technical and executive protocol with project management of Technology City of Isfahan, Isfahan, Iran   Recent Contractor-Management works  
      Sahel Sepehr Project, Contractor management of Ministrial and educational building, 11'000 sqm concrete and steel structure project, Employer: Physical Developement and Research Center (PDRC), and Sepehr Saderat, with Hendeseh Group, 2011 - 2012 Website - Photo Album   Contractor works 
      EPC project, steel structure of Golestan Building, private section, Employer: Mr. Ghanizadeh, Sa'adat Abad, Tehran, Iran, 2012   B - Supervisory in governmental section (Associated with Ministry of Roads and Urban Development) 
      Control and supervision of construction projects of army and housing cooperative of army (Awarded at the military service)Supervision and housing in Kermanshah Province - Ministry of housing and ufban development - Kermanshah, IranSupervision of the hospital of Harsin (96 beds), Kermanshah, IranSupervision of the hospital of Javanrood (96 beds), Kermanshah, IranSupervision of the hospital of Songhor (96 beds), Kermanshah, IranSupervision of the hospital of Gilan-e-Gharb (96 beds), Kermanshah, IranSupervision of the children hospital of Kermanshah (Dr. Mohammad Kermanshahi, 200 beds), Kermanshah, IranSupervision of campus development and office complex of Ghasr-e-Shirin, Kermanshah, IranSupervisor of organization houses in Javanrood, Kermanshah, IranSupervision and coordination of the 800m subway project in Shiraz, Iran - Ministry of housing and urban development.Supervision and coordination of 25 housing project in Tehran city, Iran - Ministry of housing and urban development.Coordinator expert for projects of central provinces of Iran in Ministry of housing and urban development.Consultant  of preparing the Pardis Technology Park in phase 3, and installation channel.       C - Supervisory in private section 
      Supervision on sugar refinary factory of Bistoon, Kermanshah, Iran.Supervision on road making project in industrial cities of Madiran Company.Supervision on residential and industial buildings in private section since 1990.Supervisor of railway station of Bam and the stations between Kerman and Bam, IranSupervision of reinforcement of Noor ophthalmology clinic (7'000 sqm), Tehran, IranHead supervisor of Malulin Sport Complex, (18'000 sqm), municipality region no. 20, Tehran, Iran. (Awarded in Architecture Mag.)Head supervisor of Professional Theater Complex of Tehran (16'000 sqm), Tehran, Iran. (Photo Album)Head supervisor of  Imam Reza Stadium (10'000 seats), Yaft Abad, Tehran, Iran. (Photo Album)Supervision on construction and optimization of Mozhdeh residential building (6'000 sqm), Mozhdeh St. Tehran, Iran. (Photo Album)   Design and calculations, since 1990 Design, calculation and control of structures of apartments, residential, ministrial, industrial, recreational and sport buildings in private and govertnemtal sections: 
      Calculation of Kerend Cultural Center, Kermanshah, IranCalculation of organization residential amartments of Kermanshah Ministry of Housing and Urban Development, Kermanshah, IranCalculation of Hosseiniyeh (religeous center) of Kish, Kish Island, Persian Golf, IranDesign and calculation of courthouse building of Eslam Abad, Kermanshah, IranPartnership in design and calculation of Kermanshah towns, Sarzamin Consultant, Kermanshah, IranTechnical and execution protocols for structure control of projects under management of Physical Development and Research Center (PDRC), including Oil Company projects, presidential central office and research buildings of technology parks of Tehrn and Isfahan.Head of calculation and responsible for  reinforcement of Kolah-Farangi building, ministry of telecommunication (3'000 sqm).Head of calculation and responsible for  Iran Atlas Company administrative building (9 stories, 6'000 sqm. Pasdaran St. Tehran, Iran)Head of calculation and responsible for  Multi recreational complex of Saderat Bank, Bandar Abbas, Persian Gulf, Iran (6'000 sqm.)Head of calculation and responsible for  Saderat Central Bank building of Sari (17 stories, 20'000 sqm.), Sari, Iran.Head of calculation and responsible for  East Pardis Cultural and Commercial complex (75'000 sqm.), Tehran, IranHead and responsible for calculation and supervision of Tehran Professional Theater Center (16'000 sqm. rehabilitation and reinforcement simultaneously with supervision). (Photo Album)Head of calculation and responsible for central building of Orumieh Technology Park (17'000 sqm. substructure), Orumieh, Iran.Head of calculation and responsible for Andisheh City Commercial Complex project (13'500 sqm.), Tehran, Iran.Head of calculation and responsible for Hashtgerd Project (25'000 units, 36 towers, 11 to 18 stories, 300'000 sqm. substructure). LinkHead of calculation and responsible for central building of Kermanshah Technology Park (18'000 sqm. substructure), Kermanshah, Iran. (Photo Album)Head of calculation and  for substructure facilities, preparation, design and supervision on buildings in the West Azerbaijan Technology Park, Iran.         Associated engineers in Hendeseh Mehvar Engineering Group   
      
        | No. | Name | Education | Resume - Top hints |  
        | 
          1 | 
          Mr. Majid Reza Peirovinasab | 
          B.S. Civil Engineering Gratuation: 1982 | 
          Project manager of Stadium (6'000 seats).Project manager of the Tehran Professional Theater Center, Tehran, Iran.Project manager of Eslamshahr Hospital (400 beds), Tehran, Iran.Head of supervision on Bazaar-e-Charsoogh cultural and commercial omplex(infront of Ala'eddin passage), Tehran, Iran. |  
        | 
          2 | 
          Mr. Mohammadjavad Bahadori | 
          B.S. Civil Engineering Sharif University of Technology, 1989 |  |  
        | 
          3 | 
          Mr. Majid Fazayeli | 
          Birthday: 1973 B.S. Civil Engineering | 
          1. Shahre Aftab - International Exhibition 2. Haniyeh 5 Stars hotel - Mashhad (Structure) 3. Narges Hotel - Mashhad - Foundation 4. Arman Hotel - Mashhad - 90'000 Sqm 5. Emam Reza hotel - Mashhad - 37'000 sqm |  
        | 
          4 | 
          Mr. Parviz Torkashvand | 
          Birthday: 1979 B.S. Civil Engineering | 
          10 years of accompaniment with Hendeseh GroupCalculator and head of the technical office for Sahel Sepehr project, Sa'adatabad, Tehran, Iran |  
        | 
          5 | 
          Mr. Mohammad Rahbari | 
          B.S. Civil Engineering | 
          accompaniment with Hendeseh GroupSite manager of Sahel Sepehr project, Sa'adatabad, Tehran, Iran |  
        | 
          6 | 
          Mr. Safa Daneshvar | 
          M.Sc. Civil Engineering, Geotechnical Engineering | 
          Construction Execution |  
        | 
          4 | 
          Mr. Hashem Zargoosh | 
          Birthday: 1965 B.S. Civil Engineering Elm-o-San'at University | 
          
            Construction manager of South Pars Project, Phase No. 12Construction manager of wheat silos. |  
        | 
          7 | 
          Mr. Morteza Niknam | 
          Birthday: 1984 B.S. Civil Engineering | 
          Calculation - Supervision - Executive |  
        | 
          8 | 
          Mr. Esmaeil Jashnesadeh | 
          M.Sc. Civil Engineeing, Transportation Engineering | 
          Construction and calculations |  
        | 
          9 | 
          Mr. Saeid Yousefi | 
          M.Sc. Civil Engineering, Structure Engineering | 
          Calculations |  
        | 
          10 | 
          Mr. Morteza Shahbazi | 
          M.Sc. Civil Engineering, Earthquake Engineering | 
          Calculations |  
        | 
          12 | 
          Mr. Majid Afshari | 
          M.Sc. Civil Engineeing, Transportation Engineering | 
          Construction and calculations |  
        | 
          13 | 
          Mr. Hossein Chizari | 
          B.S. Civil Engineering | 
          Construction Execution |  
        | 
          14 | 
          Mr. Shayan Etminani | 
          B.S. Civil Engineering | 
          Construction Execution |  
        | 
          15 | 
          Mr. Mohammad Mohammadi | 
          Birthday: 1980 M.S. Architecture - Yazd University | 
          Architect of Plastic Injection factory project in Parand industrial town |  
        | 
          16 | 
          Mr. Mehdi Eghbali | 
          Birthday: 1980 M.S. Architecture - Yazd University | 
          Architect supervisor of Plastic Injection factory project in Parand industrial town |  
        | 
          17 | 
          Mr. Amin Ashrafzadeh | 
          M.Sc. Civil Engineering - Structure | 
          Fajr Project - 550 unit - Office supervisor - 80'000 Square meter Zahedan Project - 550 Unit - 60'000 Square meters - Supervisor Quality Control in Hanieh 5stars hotel, Mashhad - 23'000 Square meters |  
        | 
          18 | 
          Mr. MohammadMehdi Nikoo | 
          M.Sc. Architectural Engineer |   |  
        | 
          19 | 
          Mr. Morteza Niknam |   | 
          Calculation - Supervision - Executive Engineer |      Pictures of  projects (Construction, Calculation and Supervision) Link to G+ Photo Albums         Sahel Sepehr Project, Administrative and Educational building 
      
        | Employer: Physical Development and Research Center (PDRC) Address: 2nd east Sahel alley, North Motahari St. Darya Blvd. Sa'adatabad, Tehran, Iran Protocol type: Management-Contractor, Design and Construction Technical specfications: 3 stories for parking, 6 administrative stories, about 10'000 sqm. substructure, concrete and steel structure are applied in this project. Website - Photo Album |  |  
        | 
 July 27, 2011 | 
 1391/03/05 |  
        | 
 Sahel Sepehr Project - Parking ramp | Important points in the project: Because of the neighbors, the nailing system had stoped and the ground floor structure constructed in order to safety of adjacent buildings. Then the soil of the neighbors' side excavated and ramp diaphragm and retaining wall were applied from top to bottom, finaly the foundation was applyed. March 2011   |  
        | 
 Sahel Sepehr Project - Sa'adatAbad, Tehran Website - Photo Album |    Sepand - Residential Complex 
      
        | Sepand Residential Building Employer: Haft Bana Co. Address: Sepand St. Ajoodanieh Ave. Tehran, Iran Type of contract: Contractor Management   Technical Specification:  Steel Structure 5700 square meters At stage: Foundation Date: October 6, 2016   | 
 |  
        | PHOTO ALBUM |  |    Pasargad International Wrestling Academy 
      
        | 
 | Pasargad International Wrestling Academy Employer: Pasargad Bank Address: Azadi Sport Complex, Tehran, Iran Type of contract: Project Manager   Technical Specification:  Pretentioned concrete 7500 Square meters   Timeline: June 22, 2018: Start of contract October 23, 2018: 85% total progress   Interesting facts:  Because of employer's choice, after finishing the structure, there were no contract with the main contractor, and all suppliments containing materials and equipments and executive processes was performed by various different contractors.  
            PICTURES |  
        | 
 |      Central building of Kermanshah Technology Park 
      
        | Employer: Jahad Daneshgahi of Kermanshah Address: 22 Bahman cross, Kermanshah, Iran Photo Album     |  |  
        |  | Protocol type: Calculations and supervision   Technical specfications:  The first tower and commercial units, waiting saloons, the central lobby and the bank (20'000 sqm.), steel structure. |  
        | Important points in the project: An amphitheater saloon with a width of 6m and height of 4m and length of 100m as a bridge in 60m elevation located between the two towers. Meanwhile the architectural characteristics induced to apply the braces totally on the external surface without any gassetplates.   |  |      Hanieh Hotel (5 Stars), Mashhad, Iran 
      
        | Employer: Bonyad-e-Maskan-e Enghelab Address: North East side of the Haram, Mashhad, Iran Photo Album   |  |  
        |  | Protocol type: Accompaniment in management-contractor and site management   Technical specfications: 
            Steel StructureField area: 3431 sqmSubstructure: 22'100 sqm10 stories including 5 star hotel with 130 rooms and service and administrative areas, public place, sport complex and 2'800 sqm. commercial space.   |  
        | Important points in the project: Construction speed was the major point in this project; the time to installation total structure  from the top of the foundation level was about 8 months. Simultaneously next parts of construction like facilities and architectural works were embeded in the structural process.           |  |      Reihaneh Hashtgerd, Residential Complex (2440 units) Structure design for lightweight construction 
      
        | 
 |  
        | 
 | Employer: Naji Sazan Amin Institute Address: Hashtgerd new city, Tehran, Iran Protocol type: Calculations and Value engineering Technical specifications:12 blocks of 16 and 18 stories. Substructure: 343'000 sqm.             |  
        | Important points in the project: Structure maps made by the first consultor were designed for 135 kg per square meter. four 1st grade contractor  began to work according to the primary plan after winning in the related tender and at the beginning the employer made a protocol with Daneshvar and cooperators group to recalculate the structure due to lightweight construction (value engineering to modification). As a result they reached to an about 38.5 percent of reduction in weight (52 kg reduction per square meter) and the project with the mentioned substructure (343'000 sqm) were finaly constructed (19 stories towers with the weight of 83 kg per sqare meter were the final statement of contractor). Meanwhile, because of the lightweight design and saving 30 billion tomans cost in this construction, all maps were confirmed by Mr. Tahooni's company for employer's records. Photo Album |      Malulin Sport and Recreational Complex Awarded in Architecture Magazine     Imam Reza Stadium (10'000 Seats) 
      
        | Employer: Cultural space development company Address: Yaft Abad, Tehran, Iran |  |  
        |  | Protocol type: High graded supervision Technical specifications: Concrete structure Photo Album   |      The Professional Theater Center of Tehran City 
      
        | 
 The main stage, Professional Theater Cener of Tehran, Tehran, Iran |  
        | 
 | Employer: Cultural space development company Address: Khavaran Cultural Center, Tehran, Iran   Protocol type: Calculations and high graded supervision Technical specifications: Steel structure 8 saloons for show and practise including the main saloon with 800 seats and 20m height for the scene tower (Is shown in the pictures for before and after).   Important points in the project: Reinforcement calculations for some important parts of the old structure like scene tower. Photo Album     
 |  
        | 
 |      Administrative building of tranportation Municipality of Tehran, Region No. 6 
      
        | Employer: Municipality of Tehran, Region No. 6 Address: Karimkhan St. Valiasr Sq. Tehran, Iran Photo Album   |  |  
        |  | Protocol type: Calculations and supervision management Technical specifications: Steel structure Substructure: 5'000 sqm. |      Kashanak Residential Complex Awarded in Architecture Magazine 
      
        | Employer: Mr. Ali Ghanizadeh Designer: Mr. Arash Mozaffari Address: No. 35, Mehdizadeh St. PourEbtehaj St. Tehran, Iran Protocol type: Calculations and technical supervision on construction Technical Specifications:  11 residential units with areas of 75 to 230 sqm. Start time: 2007 End time: 2011    http://memar-m.com/http://daneshvar.ir/arya/arcmag
 |  |      Mozhdeh Residential Building 
      
        | Employer: Private section Address: Mozhdeh St. Tehran, Iran   Protocol type: Technical supervision on construction Technical specifications: Steel structure Substructure: 6'000 sqm. Photo Album   |  |  
        |  |  |      Andisheh building 
      
        | Employer: Municipality of Andisheh Address: Andisheh town   Protocol type: Structure design Technical specifications: Steel structure Substructure: 6'000 sqm. |  |      Golestan building 
      
        | Employer: Private section
           Address: Golestan St. Sa'adat abad, Tehran, Iran   Protocol type: EPC           Technical specifications: Steel structure |  |    Mahtab Project 
      
        | 
 Employer: Sepehr Investment Company, Saderat Bank Address: Mahtab Alley, Artesh Blvd. Tehran, Iran             Protocol type: Managing Contractor   Technical specification: Steel Structure with bolt, Screw system Field Area: 1'990 square meters Area: 23'187 square meters Floors: 15           Use: Residential, Commercial   |  |  
        | Excavation operations: 34'075 Cubic meters Shotcrete and soil stabilization operations:  3'255 Square meters        Fondation and Reinforcement: 137'000 kg Concrete: 2'600 Cubil meters Structure weight: 3000 tons |    Recent projects by Hendeseh Mehvar Engineering Group Parand Industrial Project 
      
        | Employer: Sepehran Polymer Compnay Address: No. D7, Maryam Blvd. Parand Industrial Town, Saveh highway, Tehran, Iran Type of the contract: Design, Architectural and MC Concrete: 2'600 Cubil meters Structure weight: 3000 tons   Technical specification: 9770 square meter: including production spaces 670 square meter: Industrial Central heating  1000 square meter: Workers building 2100 square meter: Administrative building   2 Construction phases: Pre utilization and during the utilization |  |  
        |  | Special points: Utilize the structure production line in the site Constructing the  structure in the middle, so that warehose and production line is possible in the both upside and down.          |  
        |  | 
 |  
        |  | Regarding to lack of the field and sound and environmental pollutions, 670 square meter of basement area was constructed for the central heating system and grinding room.             |  
        |   
 Flooring with Epoxy layer Production saloon - Placement of the first plastic injection system |    Etehad Residential Building 
      
        | 
 |  |  
        | Etehad Residential Building Employer: Hendeseh Engineering Group Address: Old region No. 10, Tehran, Iran   Technical Specification:  Concrete structure 15 Unit                |    Sabili Residential Building 
      
        |  | 
 |  
        | Sabili Residential Building Employer: Hendeseh Engineering Group Address: Old region No. 10, Tehran, Iran   Technical Specification:  Concrete structure 10 Unit   |    Industrial Wastewater Treatment Plant - Ahwaz Eastern 
      
        |  | Industrial Wastewater treatment plant - Ahwaz Eastern Kayson & Musharif - Joint Venture Design Core    Type of contract: Design and consulting for structure with cooperating of the Design Core.            |  
        | 
 |  |        |